Treasury Place

Service provided: Steel Fabrication and Rigging

Client: Airmaster

Millennium engineered and erected a custom steel platform at Treasury Place as part of a critical infrastructure project. The platform was meticulously built on-site, with every aspect of its design and construction tailored to meet the specific requirements of the project. Millennium's experienced team handled both the fabrication and installation, utilizing a 120-tonne crane to lift and precisely position the steel structure atop theFederal Building.

Once the steel platform was securely in place, two large chillers were installed on top of the structure. These chillers play a vital role in maintaining the building’s cooling system, which is essential for regulating the internal environment and ensuring the uninterrupted operation of key systems. The use of the 120-tonne crane allowed for the safe and efficient handling of both the steel platform and the heavy chillers, ensuring that the installation was completed without any delays to the ongoing works.

This project showcased Millennium’s capability in managing complex engineering tasks, from the on-site construction of large-scale steel structures to the precise coordination of heavy-lift operations. By ensuring that the chillers were quickly and safely installed, Millennium helped maintain the project’s momentum, keeping the building’s essential services operational throughout the upgrade. The seamless execution of this project underscores Millennium’s commitment to delivering high-quality, tailored solutions for large-scale infrastructure needs

Previous
Previous

Royal Children’s Hospital

Next
Next

Woodgrove Shopping Centre